 |
STRUCTURE |
| |
All structural RCC work shall abide to the IS 456. |
| |
|
 |
WALLS |
| |
All walls are in cement block masonry. |
| |
|
 |
FLOORING |
| |
Vitrified tiles for common area and ceramic tile inside the apartment. |
| |
|
 |
DOORS |
| |
Panelled doors with hardwood door frames |
| |
|
 |
WINDOWS |
| |
Sliding Aluminium windows with MS grills |
| |
|
 |
PAINTING |
| |
Oil bound distemper for internal walls. Enamel paint for doors, grills and hand rails.
Weather proof paint for exteriors. |
| |
|
 |
KITCHEN
|
| |
Counter with Marble top, Dado tiles up to a height of 50cm., Stainless sink with drain
board. Sink and Marble counter in work area. Provision for Washing Machine and
Exhaust fan. |
| |
|
 |
ELECTRICAL WORKS
|
| |
Concealed single phase wiring with independent KSEB meters, Branded flush switches |
| |
|
 |
TOILET
|
| |
Anti-skid ceramic tiles for flooring. Ceramic wall tiles up to a height of 5 feet.
Provision for Geyser and Exhaust fan in Master bedroom toilet. |
| |
|
 |
SANITARY FITTINGS
|
| |
Branded white colour Wash basin and EWC with cistern. |
| |
|
 |
CP FITTINGS |
| |
Branded fittings. Shower, Pillar cock and Health faucet in all toilets |
| |
|
 |
CAR PARKING |
| |
Covered car parking at extra cost. Visitor’s and Guest Car parking available |
| |
|
 |
ASSOCIATION |
| |
Association office room provided at the basement. |
| |
|
 |
TELEVISION |
| |
Points for connection in Living room and Master bedroom |
| |
|
 |
TELEPHONE |
| |
Concealed wiring for telephone in Living room and Master bedroom |
| |
|
 |
BACK UP POWER |
| |
Generator back up for common area and 5 designated points provided in each
apartment. |